Volunteers needed for trail construction at Catskill Interpretive Center Site on Sunday, September 21

IMG_1661-CIC Trail WorkOn Sunday, September 21st from 10am to 3pm, the Catskills Trail Crew will be working on constructing a new trail at the site of the future Catskill Interpretive Center that will bring hikers and visitors from the Catskill Interpretive Center, across a stream and up the slope to a future viewpoint

On this trip the Trail Crew  will be clearing the trail route and beginning to construct portions of the trail. Work will include clearing, sidehilling (digging into the hillside to create a bench for the trail) and tread construction.

This work trip is part of a series of workshops and work trips that will be held at the Catskill Interpretive Center in Mount Tremper by the Trail Conference.  The goal of the ongoing workshops and work trips will be held to build an interpretive hiking trail on the property that will be open to the public for hiking and train volunteers in trail building skills.

Please make sure to wear your hiking boots; dress appropriately for the outdoor conditions and our trail building activities; pack plenty of water to stay hydrated; bring work gloves; and bring a bag lunch.

The public is welcome to join us and you do not need to be a member of the Trail Conference to join the Trail Crew. No experience is necessary, we will provide the tools and the training on site before we get started.

The work will begin at
5114 New York 28
Mt Tremper, NY 12457
GPS Coordinates: 42.027633, -74.268607

Driving Directions: Turn off of Route 28 at the Catskill Park Information sign onto the Interpretive Center roadway, drive past the information kiosk, cross the bridge and enter the circular part of the road. The trail crew will be entering the woods at the north side of the circle near the small sign-in booth. Parking is available along the circle.

For more information, visit the Trail Conference’s event page for this work trip.

Press Release for Event

Photos from prior work trips on the Interpretive Center trails:

Trail Crew members cleared the route of the new trail

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s